This house took quite a bit of work and way too long to repair. A lot of the delays came from upgrading the electrical system and the fact we have 19 flips going right now and not enough contractors to do them all.
We refinished the hardwood floors, redid the kitchen, redid the bath, made the family room addition into a bedroom if needed, replaced the roof, and painted everything. There is always some electrical, plumbing and HVAC work that needs to be done as well.
You can see the before video on this one here:
My book on flipping houses is here:
0 Comments